California · San Francisco
San Francisco Building Permits
Building code, permits and inspections. Summarized from the official City of San Francisco site; always confirm details at the source. sf.gov
How it works
- Step 1
Planning entitlement
Landmark and historic buildings must get approval from SF Planning first.
- Step 2
Apply for permits
The Department of Building Inspection (DBI) reviews every building permit application for life safety and building code compliance.
- Step 3
Construction
Only start work after the permit is issued.
- Step 4
Inspections
Inspectors check the work for code compliance and permit scope.
Simple projects (Over-the-Counter permits)
PermitSF permitting portal
Apply online for signs and awnings, no-plan reroofing, plumbing and electrical work, in-kind non-structural kitchen and bath, and door, window and siding replacements.
Where to apply for your permit
San Francisco offers multiple ways to apply based on your project.
OTC permit: interior residential remodel
Kitchen, bath and other interior residential remodels.
OTC permit: exterior residential project
Decks, fences and other exterior residential projects needing Over-the-Counter review.
OTC permit: commercial project
Steps to meet commercial construction requirements and get your building permit.
Complex projects (In-House review)
Planning entitlement
Fire-only construction
Other services
Resources
Current San Francisco building codes
Applications filed on or after January 1, 2026 must use the 2025 California Codes and 2025 San Francisco Amendments. There is no grace period.
Building occupancy classes
Look up your occupancy classification, which affects construction safety requirements.
Existing uses in building permits
List of existing building uses for PermitSF applications.
PermitSF portal how-tos
Instructions and tips for using the PermitSF portal.
Fire Department plan check
The Fire Department reviews plans for buildings with 3 or more residential units.
Water, power, sewer and stormwater
SFPUC requirements for water, energy efficiency and sewer function.
Electronic plan review (Bluebeam)
Responding to comments during In-House Review.
Partner agencies
Information current as of November 2026. HeyUrban is not affiliated with the City and County of San Francisco.